July 30 of 2010 Español

News

  1. San Gabriel Hydroelectric Plant is operating again
  1. Grupo Ecoenergía works as BCIE´s supervisor for the San Jacinto Geothermal Project in Nicaragua
  1. Company represented by Grupo Ecoenergía wins BCIE bid
  1. Book donation to schools located in the proximity of our electricity generating plants
  1. Mercados y Tendencias Magazine, February-March 2010
  1. Jocotal students visit San Gabriel Hydroelectric Plant
  1. Share with us in Facebook
 

San Gabriel Hydroelectric Plant is operating again

The San Gabriel Hydroelectric is again providing clean energy to the national electric grid.  This project was purchased by Grupo Ecoenergía at the end of 2009.

Recently, the ISO 14001:2004 certification of the plant was ratified.

The plant is located in Aserrí, Costa Rica.

 
© 2008 ALL RIGHTS RESERVED SITE DESIGNED BY: